Key words: production planning, geological uncertainty, stochastic methods.
In this paper the approach to planning of oil production levels based on geological uncertainty is proposed. Method proposed takes into account production risks through the multivariate calculations application by numerical and semi-analytical reservoir models as the main stages of the planning workflow. By using this approach one can quickly calculate the possible technological and economic characteristics of the development project.
References
1. Kolmogorov A.N., Zhurbenko I.G., Prokhorov A.V., Vvedenie v teoriyu veroyatnostey (Introduction to the Theory of probabilities), Moscow: Nauka Publ., 1982, 160 p.
2. Instruktsii po otsenke perspektivnykh ploshchadey pri pomoshchi paketa GeoX (Instructions for assessment of prospects using the package GeoX), Oslo, June 2010.
3. Kuznetsov M.A., Sevast'yanova K.K., Nekhaev S.A., Neftyanoe khozyaystvo – Oil Industry, 2011, no. 6, pp. 2-6.
4. Krasnov V.A., Sudeev I.V., Yudin E.V., Lubnin A.A., Nauchno-tekhnicheskiy Vestnik OAO Rosneft', 2010, no. 1, pp. 2-6.
5. Krasnov V.A., Yudin E.V., Lubnin A.A., Nauchno-tekhnicheskiy Vestnik OAO Rosneft', 2010, no. 2, pp. 2-6.
6. Metropolis N., Ulam S., The Monte Carlo method, J. Amer. Statistical assoc. 1949 44, no. 247 335, pp. 341.
7. Prod'yakonov M.M., Teder R.I., Metodika ratsional'nogo planirovaniya eksperimentov (The method of rational design of experiments), Moscow: Nauka Publ., 1970, 93 p.