Analysis of the effectiveness of the reservoir pressure maintenance system at the main object of development of Vyngapurovskoye field

Authors: O.A. Loznyuk (Gazpromneft - Noyabrskneftegaz JSC), A.A. Alvard, E.A. Rukavchuk (Gazpromneft NTC LLC)
The high efficiency of the created reservoir pressure maintenance system at the main object of development of Vyngapurovskoye field - BV8 stratum is marked. Unreasonableness of flooding through a linear cutting sets of wells is stated. Continuation of the fluid withdrawals reduction compensation by pumping at the expense of the injection volumes redistribution along the wells, increase reservoirs sweep by injection through combined flooding with polymers and surfactants injection and use of sediment formation technology are recommended.
The high efficiency of the created reservoir pressure maintenance system at the main object of development of Vyngapurovskoye field - BV8 stratum is marked. Unreasonableness of flooding through a linear cutting sets of wells is stated. Continuation of the fluid withdrawals reduction compensation by pumping at the expense of the injection volumes redistribution along the wells, increase reservoirs sweep by injection through combined flooding with polymers and surfactants injection and use of sediment formation technology are recommended.


Attention!
To buy the complete text of article (a format - PDF) or to read the material which is in open access only the authorized visitors of the website can. .

Mobile applications

Read our magazine on mobile devices

Загрузить в Google play

Press Releases

11.10.2021
07.10.2021
29.09.2021
Конкурс на соискание молодежной премии имени академика И.М. Губкина