Enhancement of development efficiency of the field with difficult-to-recover reserves by the dynamic optimization of the behavior of the wells, equipped by the electrical submersible pumps

Authors: A.N. Yantudin, A.Z. Fazullin, I.R. Mukminov (RN-UfaNIPIneft LLC)
The original method, developed and applied in Oil Company Rosneft integrated project of Mamontovskoye field development and construction, has been proposed in this article. Given method allows to execute the optimization of the operating practices of electrical submersible pump work fr om the whole well stock to get additional oil production at available lim it of electrical energy. During work execution the results of development work by restriction of high watered productivity wells with high power inputs on Mamontovskoye field were used.


Attention!
To buy the complete text of article (Russian version a format - PDF) or to read the material which is in open access only the authorized visitors of the website can. .

Юбилей Великой Победы

Pobeda80_logo_main.png В юбилейном 2025 году подготовлены: 
   - специальная подборка  статей журнала, посвященных подвигу нефтяников в годы Великой Отечественной войны;  
   - списки авторов публикаций журнала - участников боев и участников трудового фронта

Press Releases

02.06.2025
30.05.2025
30.05.2025
29.05.2025
26.05.2025