The article discusses current trends aimed at improving the quality and accuracy of cost estimates at the project design stage. On the one hand, the high importance of cost estimates for making managerial decisions and ensuring the economic efficiency of construction projects determines the need to develop measures to improve the accuracy of estimates. On the other hand, it is necessary to take into account that the estimated documentation is based on design documentation, which also has a certain accuracy of the engineering decisions made. And if at the pre–project stages, as well as at the stage of developing detailed documentation, the methods and approaches of cost estimation are clear and logical (in both world and Russian practice), then at the stage of developing project documentation they are more contradictory, and some of them carry the risks of illusory achievement of the initial goal – to increase the accuracy of the cost estimate. The article analyzes the changes in the approach to the development of estimates at the stage of project documentation from the point of view of methods and trends of recent times, draws an analogy with world practice, and shows the risks associated with attempts to improve the accuracy of estimates using the proposed methods.
References
1. Kenneth K., McDonald D.F. JR, Miller B.A. et al., Cost estimate classification system – As applied in engineering procurement, and construction for the process industries, AACE International Recommended Practices, 2005.
2. Lakhaev S.V., Strategiya razvitiya tsenoobrazovaniya v stroitel’stve. Realizuemye meropriyatiya (Construction pricing development strategy. Implemented measures), URL: https://gge.ru
3. MDS 81-02-13-2014. Metodicheskie dokumenty po formirovaniyu smetnogo razdela proektnoy dokumentatsii s primeneniem ukrupnennykh normativov tseny konstruktivnykh resheniy (Methodological documents for the formation of the estimate section of design documentation using consolidated standards for the price of design solutions).