Selection of the optimal development system for oil and gas fields using horizontal, multilateral and horizontal wells with multi-stage hydraulic fracturing

UDK: 622.24.085
DOI: 10.24887/0028-2448-2026-1-46-51
Key words: oil and gas field development system, horizontal wells, multilateral wells, multistage hydraulic fracturing, geological conditions, reservoir permeability, reservoir heterogeneity, permeability anisotropy, selection of optimal development system
Authors: D.A. Sugaipov(Synergy LLC, RF, Saint Petersburg)

The paper addresses the problem of selecting an optimal development system for oil and gas fields using horizontal wells (HW), multilateral wells (MLW), and horizontal wells completed with multi-stage hydraulic fracturing (MSHF) under a wide range of geological conditions. Based on more than 25 years of reservoir simulation and exploration experience of fields in Western and Eastern Siberia, on the Arctic shelf, and a number of onshore fields, a matrix-type decision algorithm that integrates key geological and technological parameters into a single framework was developed. The algorithm explicitly accounts for fluid saturation type, permeability anisotropy, lateral and vertical connectivity, absolute permeability level, reservoir heterogeneity, oil viscosity and the proximity of fluid contacts that enables to significantly narrow the space of options and to focus modelling efforts on a limited set of development scenarios combining well pattern geometry, completion types and reservoir pressure maintenance systems. Recommended ranges are provided for horizontal section length, number of laterals in MLW, and number of MSHF stages, as well as for the applicability of line-drive, staggered and radial patterns in thin oil rims, gas-oil zones and low-permeability reservoirs. The proposed workflow helps to reduce the number of simulation runs, accelerates the selection of robust development concepts for unconventional and marginal resources and ultimately improves the capital efficiency and recovery factors of complex oil and gas fields.

References

1. Rossiyskiy rynok bureniya neftyanykh skvazhin: tekushchee sostoyanie i stsenarii razvitiya do 2030 goda (The Russian oil drilling market: Current status and development scenarios to 2030), Moscow: Publ. of RPI, 2024, 119 p.

2. Tuykin T.A., Gryazov A.A., Fazlutdinov V.I., Povyshenie effektivnosti tekhnologiy zakanchivaya i MGRP (Improving the efficiency of finishing and multistage hydraulic fracturing technologies), Proceedings of Scientific and technical conference “Innovatsionnye tekhnologii v dobyche uglevodorodov” (Innovative technologies in hydrocarbon production), Ufa, 20–23 May 2025, Ufa, 2025.

3. Khasanov M.M., Ushmaev O.S., Samolovov D.A. et al., Estimation of cost effective oil thickness of oil rims developed with horizontal wells (In Russ.), Neftyanoe khozyaystvo = Oil Industry, 2013, no. 12, pp. 44–47.

4. Bilinchuk A.V., Rustamov I.F., Bulgakov E.Yu. et al., Gazprom neft: Drilling management centre case study (Integrated operating management systems), ROGTEC Magazine, 2018, no. 9, pp. 36–44.

5. Sugaipov D.A., Vorob’eva G.N., Galeev R.R. et al., Selecting the optimal development system (In Russ.), Neftyanoe khozyaystvo = Oil Industry, 2019, no. 6, pp. 38–40, DOI: https://doi.org/10.24887/0028-2448-2019-6-38-40

6. Sugaipov D.A., Rustamov I.F., Ushmaev O.S. et al., Results of multilateral drilling on Novoportovskoye field (In Russ.), Neftyanoe khozyaystvo = Oil Industry, 2017,

no. 12, pp. 35–36, DOI: https://doi.org/10.24887/0028-2448-2017-12-35-36

7. Sugaipov D.A., Bazhenov D.Yu., Devyat’yarov S.S. et al., ERA:Production – an integrated platform for increasing the efficiency of the operation of the artificial lift and oil fields (In Russ.), Neftyanoe khozyaystvo = Oil Industry, 2017, no. 12, pp. 60–63, DOI: https://doi.org/10.24887/0028-2448-2017-12-60-63

8. Sugaipov D.A., Rustamov I.F., Ushmaev O.S. et al., Multilateral wells application in continental facies of Vostochno-Messoyakhskoye field (In Russ.), Neftyanoe khozyaystvo = Oil Industry, 2017, no. 12, pp. 49–51, DOI: https://doi.org/10.24887/0028-2448-2017-12-49-51

9. Sugaipov D.A., Nekhaev S.A., Perevozkin I.V. et al., Optimization of well pattern for oil rim fields (In Russ.), Neftyanoe khozyaystvo = Oil Industry, 2019, no. 12,

pp. 44–46, DOI: https://doi.org/10.24887/0028-2448-2019-12-44-46

10. Sugaipov D.A., Kovalenko I.V., Kuznetsov S.V. et al., Development of the oil fringe of the Yaro-Yahinskoye field by horizontal wells in conditions of layered reservoirs with a high degree of secondary changes (In Russ.), Neftyanoe khozyaystvo = Oil Industry, 2018, no. 12, pp. 54–56, DOI: https://doi.org/10.24887/0028-2448-2018-12-54-56

11. Sugaipov D.A., Yakovlev A.A., Galyautdinov I.M. et al., Improving of new wells drilling efficiency based on the selection of optimal drilling pattern for the south-western block of Orenburg oil, gas and condensate field (In Russ.), PROneft’. Professional’no o nefti, 2019, no. 1, pp. 29–33, DOI: https://doi.org/10.24887/2587-7399-2019-1-29-33

12. Sugaipov D.A., Ushmaev O.S., Bazhenov D.Yu. et al., Approaches to justifying combined development systems: a case study of NP8 and J2-6 reservoirs of Novoportovskoye oil-gas-condensate field (In Russ.), Neftyanoe khozyaystvo = Oil Industry, 2018, no. 12, pp. 26–29, DOI: https://doi.org/10.24887/0028-2448-2018-12-26-29

13. Sugaipov D.A., Lyapin V.V., Reshetnikov D.A. et al., Selecting optimal technology for wells completion in the oil rims of continental genesis on the example of layers PK1-3 of the Vostochno-Messoyakhskoye and Tazovskoye fields (In Russ.), Neftyanoe khozyaystvo = Oil Industry, 2019, no. 4, pp. 66–69,

DOI: https://doi.org/10.24887/0028-2448-2019-4-66-69

14. Sugaipov D.A., Savel’ev V.A., Mirsaetov O.M., Vliyanie parametrov razrabotki na okhvat gorizontal’no razburennogo plasta drenirovaniem i vozdeystviem v zavisimosti ot geologo-fizicheskikh faktorov (The influence of development parameters on the coverage of a horizontally drilled formation by drainage and impact depending on geological and physical factors), Proceedings of The Second Republican Scientific and Practical Conference “Povyshenie effektivnosti razrabotki trudnoizvlekaemykh zapasov nefti” (Improving the efficiency of developing hard-to-recover oil reserves), 4–5 November 2003, Izhevsk, 2003, pp. 65–72.

15. Sugaipov D.A., Savel’ev V.A., Mirsaetov O.M., Volkov A.Ya., K voprosu o vozmozhnosti primeneniya nagnetatel’nykh gorizontal’nykh skvazhin dlya razrabotki neftyanykh mestorozhdeniy (On the possibility of using horizontal injection wells for the development of oil fields), Proceedings of The Second Republican Scientific and Practical Conference “Aktual’nye zadachi vyyavleniya i realizatsii potentsial’nykh vozmozhnostey gorizontal’nykh tekhnologiy nefteizvlecheniya” (Current challenges in identifying and implementing the potential of horizontal oil recovery technologies), 18–19 December 2003, Kazan, pp. 28–30.

16. Savel’ev V.A, Sugaipov D.A., Evaluation of the efficiency of oil field development using horizontal production and injection wells (In Russ.), Vestnik Udmurtskogo Universiteta, 2002, no. 8, pp. 87–102.

17. Sugaipov D.A., Savel’ev V.A., Volkov A.Ya., Mirsaetov O.M., On the optimal location of horizontal wells in oil field development (In Russ.), Neft’ i burenie, 2003, no. 12, pp. 15–22.

18. Mustafin A.R., Development of approaches to the design of completion structures for horizontal and multilateral wells with hydraulic fracturing for the development of hard-to-recover reserves (In Russ.), Inzhenernaya praktika, 2005, no. 1.

19. Khasanov M.M., Ushmaev O.S., Nekhaev S.A., Karamutdinova D.M., Selection of optimal parameters of oil field development (In Russ.), Neftyanoe khozyaystvo = Oil Industry, 2012, no. 12, pp. 26–31.

20. Khasanov M.M., Ushmaev O.S., Samolovov D.A. et al., A method to determine optimum well spacing for oil rims gas-oil zones, SPE-166898-MS, 2013,

DOI: https://doi.org/10.2118/166898-ms

21. Govzich A.N., Bilinchuk A.V., Fayzullin I.G., Horizontal well multi-stage fracturing -Gazprom Neft JSC experience (In Russ.), Neftyanoe khozyaystvo = Oil Industry, 2012, no. 12, pp. 59-61.

22. Khasanov M.M., Ushmaev O.S., Samolovov D.A. et al., A method to determine optimum well spacing for oil rims gas-oil zones (In Russ.), SPE-166898-MS, 2013, DOI: https://doi.org/10.2118/166898-MS



Attention!
To buy the complete text of article (Russian version a format - PDF) or to read the material which is in open access only the authorized visitors of the website can. .