New tools of Rosneft Oil Company for increasing design efficiency: Cluster Pad.AI

UDK: 622.276:012.69
DOI: 10.24887/0028-2448-2024-8-110-114
Key words: capital construction objects, design documentation, digital transformation, information model, design automation
Authors: D.G. Didichin, V.A. Pavlov (Rosneft Oil Company, RF, Moscow) S.A. Ivanov (Rosneft Oil Company, RF, Moscow) A.A. Polnikov (Rosneft Oil Company, RF, Moscow) A.A. Dmitryuk (RN-BashNIPIneft LLC, RF, Ufa) A.V. Apokin (RN-BashNIPIneft LLC, RF, Ufa) I.A. Kalimullin (RN-BashNIPIneft LLC, RF, Ufa) М.S. Kulagin (RN-BashNIPIneft LLC, RF, Ufa) I.B. Manzhola (TomskNIPIneft JSC, RF, Tomsk) M.O. Panin (TomskNIPIneft JSC, RF, Tomsk) A.A Muruntaev (TomskNIPIneft JSC, RF, Tomsk) R.A. Gnilitsky (Tyumen Petroleum Research Center LLC, RF, Tyumen) A.S. Kosarev (Tyumen Petroleum Research Center LLC, RF, Tyumen) A.V. Nazarov (RN-Yuganskneftegaz LLC, RF, Nefteyugansk) D.S. Goryachev (RN-Yuganskneftegaz LLC, RF, Nefteyugansk)

The article reviews the topical issue of accelerating the transition to the information modeling of capital construction facilities in the oil and gas industry and ways to address this issue based on developing an «intelligent and lean» approach behind the pattern design methodology. The tool that allows for the reduction of labor costs is the intelligent system for information modeling of Cluster Pads.AI. The article describes the layered architecture of Cluster Pad.AI. It is shown that Cluster Pad.AI is an element of the general IT landscape of design and survey works of Rosneft Oil Company and ensures an optimum transition from the traditional document-oriented approach to the data-oriented one. Cluster Pad.AI provides automation of solutions throughout the value chain – from raw data input to obtaining the finished information model and design documents, which allows reducing time for building the information model for standard cluster pads, eliminating a human factor when building the information model due to the reduction of a number of a design engineer’s routine tasks, issuing the design estimates based on these models, increasing the coverage of the standard cluster pads with the information modeling technology up to 100 %. The article shows that the development and implementation of the Cluster Pad.AI project is a consistent continuation of the implementation of Rosneft Oil Company initiatives on the transition from the traditional design to the information modeling, which in the long run will allow the transition to the use of artificial intelligence tools to improve the design solutions and design documentation management efficiency.

References

1. Didichin D.G., Pavlov V.A., Volkov M.G. et al., New tools of Rosneft to improve the efficiency of design: the transition to 3D technology and information modeling in the block of capital construction (In Russ.), Neftyanoe khozyaystvo = Oil Industry, 2023, no. 8, pp. 64–68, DOI: https://doi.org/10.24887/0028-2448-2023-8-64-68

2. Avrenyuk A.N., Didichin D.G., Pavlov V.A. et al., 3D engineering for Rosneft oil producing facilities construction (In Russ.), Neftyanoe khozyaystvo = Oil Industry, 2022, no. 11, pp. 64–67, DOI: https://doi.org/10.24887/0028-2448-2022-11-64-67

3. Perechen’ porucheniy po realizatsii Poslaniya Prezidenta Federal’nomu Sobraniyu (List of instructions for the implementation of the President’s Address to the Federal Assembly), approved by the President of the Russian Federation on 30.03.2024 No. Pr-616

4. Resolution of the Government of the Russian Federation of March 5, 2021 No. 331 “Ob ustanovlenii sluchaev, pri kotorykh zastroyshchikom, tekhnicheskim zakazchikom, litsom, obespechivayushchim ili osushchestvlyayushchim podgotovku obosnovaniya investitsiy, i (ili) litsom, otvetstvennym za ekspluatatsiyu ob»ekta kapital’nogo stroitel’stva, obespechivayutsya formirovanie i vedenie informatsionnoy modeli ob»ekta kapital’nogo stroitel’stva” (On the establishment of cases in which the developer, technical customer, person providing or carrying out preparation of investment justification, and (or) person responsible for operation of capital construction project, ensure the formation and maintenance of an information model of capital construction project).

5. Didichin D.G., Pavlov V.A., Ivanov S.A. et al., Innovative Rosneft tools to improve development of design documentation efficiency: digital etalon project (In Russ.), Neftyanoe khozyaystvo = Oil Industry, 2023, no. 5, pp. 111–115, DOI: https://doi.org/10.24887/0028-2448-2023-5-111-115

6. Kravchenko A.N., Kosarev A.S., Pavlov V.A. et al., Standard design - Moving with the times (In Russ.), Neftyanoe khozyaystvo = Oil Industry, 2020, no. 11, pp. 13–15, DOI: https://doi.org/10.24887/0028-2448-2020-11-13-15

7. Didichin D.G., Pavlov V.A., Ivanov S.A. et al., New tools of Rosneft to improve the efficiency of design: platform solutions (In Russ.), Neftyanoe khozyaystvo = Oil Industry, 2023, no. 12, pp. 135–138, DOI: https://doi.org/10.24887/0028-2448-2023-5-111-115


Attention!
To buy the complete text of article (Russian version a format - PDF) or to read the material which is in open access only the authorized visitors of the website can. .