Key words: production well, sidetrack, quality fixtures, complications during oil.
Sidetracking is accompanied by a lack of reliable technology: opening, development, evaluation and stimulation intervals, conduct geological and engineering and repair and insulation works. Imperfection of technologies negative impacts on technical and economic indicators of hydrocarbon deposits development. The article provides criteria of wells selection for the sidetracks construction using statistical methods. Technical-technological solutions are presented to reduce construction time and increase the efficiency of operation of laterals, and to reduce the impact on the source data for statistical analysis when selecting wells.
References
1. Melekhin A.A., Chernyshov S.E., Turbakov M.S., Neftyanoe khozyaystvo – Oil Industry, 2012, no. 3, pp. 50-52.
2. Tokareva T.V., Elektronnyy nauchnyy zhurnal “Neftegazovoe delo” – The electronic scientific journal Oil and Gas Business, 2011, no. 2, pp. 457-468.
3. Khisamov R.S., Ibatullin R.R., Fazlyev R.T., Yusupov I.G., Neftyanoe khozyaystvo – Oil Industry, 2003, no. 8, pp. 46-48.
4. Chernyshov S.E., Turbakov M.S., Krysin N.I., Neftyanoe khozyaystvo – Oil Industry, 2011, no. 8, pp. 98-100.
5. Chernyshov S.E., Neftyanoe khozyaystvo – Oil Industry, 2010, no. 6, pp. 22-24.
6. Chernyshov S.E., Krysin N.I., Kunitskikh A.A., Neftyanoe khozyaystvo – Oil Industry, 2011, no. 10, pp. 20-21.
7. Chernyshov S.E., Turbakov M.S., Krysin N.I., Neftyanoe khozyaystvo – Oil Industry, 2011, no. 1, pp. 78-80.
8. Chernyshov S.E., Krysin N.I., Kunitskikh A.A., Neftyanoe khozyaystvo – Oil Industry, 2012, no. 8, pp. 108-110.
9. Shcherbakov A.A., Turbakov M.S., Dvoretskas R.V., Neftyanoe khozyaystvo – Oil Industry, 2012, no. 12, pp. 97-99.