Key words: well workover, squeeze job.
This paper is related to the technology of insulation of extended 146 mm production casing defects by mounting of additional 120 mm casing in RN-Purneftegaz LLC. The results of field operations are presented.
References
1. Umetbaev V.G., Merzlyakov V.F., Volochkov N.S., Kapital'nyy remont skvazhin. Izolyatsionnye raboty (Workover. Insulation works), Ufa: Publ. of ANK ”Bashneft'”, 2000, 424 p.
2. Presnyakov A.Yu., Mikhaylov A.G., Alikin E.S., Miller A.V., Enikeev V.N., Tashbulatov V.D., Geologiya, geofizika i razrabotka neftyanykh i gazovykh mestorozhdeniy, 2009, no. 9, pp.29-33.
3. Strizhnev V.A., Kornilov A.V., Nikishov V.I. et al., Neftepromyslovoe delo, 2008, no. 4, pp. 28-34.