Advances in technology of elimination of production casing leaks within wide interval

Authors: R.N. Yunusov, A.V. Sakhan, A.S. Burmistrov, R.A. Yagudin (RN-Purneftegaz LLC, RF, Gubkinsky), I.A. Malykhin, Yu.S. Solovjev (Service Company Navigator LLC, RF, Leninogorsk)

Key words: well workover, squeeze job.

This paper is related to the technology of insulation of extended 146 mm production casing defects by mounting of additional 120 mm casing in RN-Purneftegaz LLC. The results of field operations are presented.

References

1. Umetbaev V.G., Merzlyakov V.F., Volochkov N.S., Kapital'nyy remont skvazhin. Izolyatsionnye raboty (Workover. Insulation works), Ufa: Publ. of ANK ”Bashneft'”, 2000, 424 p.

2. Presnyakov A.Yu., Mikhaylov A.G., Alikin E.S., Miller A.V., Enikeev V.N., Tashbulatov V.D., Geologiya, geofizika i razrabotka neftyanykh i gazovykh mestorozhdeniy, 2009, no. 9, pp.29-33.

3. Strizhnev V.A., Kornilov A.V., Nikishov V.I. et al., Neftepromyslovoe delo, 2008, no. 4, pp. 28-34.


Attention!
To buy the complete text of article (Russian version a format - PDF) or to read the material which is in open access only the authorized visitors of the website can. .