Keywords: producing well, grouting mortar, gas-liquid mixture, well completion, difficult recoverable oil reserves, oil recovery troubles.
A study of 10 trains of gas-liquid mixtures (GLM) for the primary opening of productive layers with abnormally low reservoir pressure, which consist of the following reagents: a complex of surfactant, a complex stabilizers and builders, glycerine, caustic soda, GKZ-11.Vse investigated solutions have the ability to re-foaming.
References
1. Babushkin E.V., Stroitel'stvo neftyanykh i gazovykh skvazhin na sushe i na more, 2009, no. 10, pp. 24-29.
2. Yakovlev A.A., Turitsyna M.V., Vestnik Permskogo natsional'nogo issledovatel'skogo politekhnicheskogo universiteta. Geologiya. Neftegazovoe i gornoe delo, 2012, no. 4, pp. 42-48.
3. Chernyshov S.E., Turbakov M.S., Krysin N.I., Neftyanoe khozyaystvo – Oil Industry, 2011, no. 8, pp. 98-100.
4. Chernyshov S.E., Turbakov M.S., Krysin N.I., Neftyanoe khozyaystvo– Oil Industry, 2011, no. 1, pp. 78-80.
5. Melekhin A.A., Chernyshov S.E., Turbakov M.S., Neftyanoe khozyaystvo – Oil Industry, 2012, no. 3, pp. 50-52.
6. Yakovlev A.A., Nauchno-prakticheskie osnovy tekhnologii bureniya i krepleniya skvazhin s primeneniem gazozhidkostnykh promyvochnykh i tamponazhnykh smesey (Scientific and practical basis of drilling and well casing using a gas-liquid washing and cement mixtures),Thesis of doctor of technical sciences, Sankt-Peterburg, 2001.
7. Turitsyna M.V., Chernobrovin E.V., Morozov V.A., Teleev G.Yu., Kovalev A.V., Ryabokon' E.P., Neftyanoe khozyaystvo – Oil Industry, 2012, no. 8, pp. 111-113.