The experience of application of diagnostic plots to assess the causes of premature water cut of wells at fields of Russia is considered. The yield data, water-oil ratio values, the production logging results were used for analysis. The assessment of correspondence of results of assess the water cut causes by diagnostic plots with production logging data are executed on the large volume of material.
Key words: water cut, water/oil ratio, production logging, water control diagnostic plots.
References
1. Bailey B., Krabtree M., Tyrie J., et al., Water control oilfield review, Spring 2000, V. 12, Issue 1, pp. 30-51.
2. Merkulova L.I., Ginzburg A.A. Graficheskie metody analiza pri dobyche nefti (Graphical methods of analysis for crude oil production), Moscow: Nedra Publ., 1986, 125 p.
3. Chan K.S. Water control diagnostic plots, SPE 30775.
4. Lo K.K., et al., A study of the post-breakthrouth characteristics of waterfloods, SPE 20064.