Effect of pulling units reliability on the effectiveness of wells remedial work teams

Authors: A.S. Kuznetsov (Tyumen State Oil and Gas University), M.M. Ivankiv, S.G. Schergin, K.A. Kuznetsov (Surgutneftegaz OAO)
The dynamics of down time of well repair work teams, caused by the failures of pulling units, is given. The results of reliability studies of the basic components of pulling units AR32/40M are presented. The parameters and the laws of distributions of mean-time-between-failures of the inspected pulling units components are determined.


Attention!
To buy the complete text of article (Russian version a format - PDF) or to read the material which is in open access only the authorized visitors of the website can. .

Юбилей Великой Победы

Pobeda80_logo_main.png В юбилейном 2025 году подготовлены: 
   - специальная подборка  статей журнала, посвященных подвигу нефтяников в годы Великой Отечественной войны;  
   - списки авторов публикаций журнала - участников боев и участников трудового фронта

Press Releases

02.06.2025
30.05.2025
30.05.2025
29.05.2025
26.05.2025