Analysis of the reliability of hoisting units at well-workover operation

Authors: S.A. Savin, M.M. Ivankiv, S.G. Schergin (Surgutneftegaz OAO), A.S. Kuznetsov (Tyumen State Oil and Gas University)
The causes of well-workover crews downtimes are given, and also the causes of failures of hoisting units, used at wellworkover carrying out, are analyzed. The obtained data can be used for updating the standards of operational capability of hoisting units, as well as for the formation of reusable components and mechanisms for their repair.
The causes of well-workover crews downtimes are given, and also the causes of failures of hoisting units, used at wellworkover carrying out, are analyzed. The obtained data can be used for updating the standards of operational capability of hoisting units, as well as for the formation of reusable components and mechanisms for their repair.


Attention!
To buy the complete text of article (a format - PDF) or to read the material which is in open access only the authorized visitors of the website can. .

Mobile applications

Read our magazine on mobile devices

Загрузить в Google play

Press Releases

25.02.2021
16.02.2021
12.02.2021