The modern world is changing the usual ways of developing design and working documentation for capital construction projects. The requirements of regulatory documents are changing; the latest program complexes are being developed and implemented. At the same time the cost of development of design and working documentation is calculated according to the Collections of basic prices approved more than 15 years ago. This situation clearly shows the need to update the regulatory framework for determining the cost of design work. This article describes a modern approach to the pricing of design and survey work at Rosneft Oil Company. The historical experience of the application of estimated standards is investigated, as well as the reasons determining the need to revise the current estimated standards for engineering surveys, preparation of design and working documentation. A study of the application of methods based on the analysis of the actual labor costs of the performers of the work and the resources involved in the development of the estimated standard for design and survey work is presented. The process of developing standard costs for design work is described by the calculation and analytical method based on the analysis of designers' labor costs. This method enables to consider current modern design methods and take into account their features in the indicators of the estimated standard. Based on the results of the conducted research, it is possible to build an objective model for the formation of a reliable cost of design work.
References
1. World Bank Group, URL: https://data.worldbank.org/indicator/NV.IND.TOTL.ZS?locations=Z4
2. Yusupova S.M., Reglamentatsiya i normirovanie truda (Regulation and standardization of labor), Saratov: Saratov State University, 2015, 147 p.