The article discusses issues related to the development of a carbonate formation in an oil field. Specifically, the incomplete coverage of the deposit by the stationary flooding and the high water content of the produced fluids. The analysis of the target formation structure revealed the presence of geological heterogeneities, which are the root cause of the existing problems. To solve them, it is proposed to use the cyclic flooding method which is a cost-effective solution for enhanced oil recovery, as it redistributes pressures in the reservoir and alters filtration flows to recover additional oil from poorly drained zones. This technology is preferred over other expensive methods. The authors propose geological and technical measures to improve the development system in response to various possible cycles of transient flooding. The study focuses on hydrodynamic modeling using Tempest More software for standard injection and cyclic pumping. Each variant is analyzed for technological efficiency; the choice of the optimal option is justified. The economic evaluation of implementing non-stationary waterflooding technology in combination with selected geological and technological measures is presented. Based on the results obtained during the work the authors have established the technical and economic efficiency of this proposed method for solving development problems of the target formation.
References
1. Yartiev A.F., Khabibrakhmanov A.G., Podavalov V.B., Bakirov A.I., Cyclic water flooding of Bobric formation at Sabanchinskoye field (In Russ.), Neftyanoe khozyaystvo = Oil Industry, 2017, no. 3, pp. 85–87, DOI: http://doi.org/10.24887/0028-2448-2017-3-85-87
2. Muslimov R.Kh., Problems of exploration and development modeling of oil fields (In Russ.), Georesursy, 2018, V. 20, no. 3, pp. 134–138,
DOI: https://doi.org/10.18599/grs.2018.3.134-138
3. Martyushev D.A., Mengaliev A.G., Planning of cyclic watering based on anisotropic hydrodynamic model of the carbonate deposit of Gagarinskoe field (In Russ.), Izvestiya Tomskogo politekhnicheskogo universiteta. Inzhiniring georesursov = Bulletin of the Tomsk Polytechnic University Geo Assets Engineering, 2020, V. 331, no. 12, pp. 84–93,
DOI: http://doi.org/10.18799/24131830/2020/12/2942
4. Al’mukhametova E.M., Expanding the experience of using non-stationary waterflooding technology with changing direction of the filtration flow in the example of the Northern Buzachi field (In Russ.), Georesursy, 2018, V. 20, no. 2, pp. 115–121,
DOI: http://doi.org/10.18599/grs.2018.2.115-121
5. Muslimov R.Kh., History and prospects of hydrodynamic methods for oil fields development in Russia (In Russ.), Neftyanoe khozyaystvo = Oil Industry, 2020, no. 12, pp. 96–100, DOI: http://doi.org/10.24887/0028-2448-2020-12-96-100
6. Rodionov S.P., Pichugin O.N., Kosyakov V.P., Shirshov Ya.V., On the selection of oil fields areas for the effective use of cyclic waterflooding
(In Russ.), Neftyanoe khozyaystvo = Oil Industry, 2019, no. 4,
pp. 58–61, DOI: https://doi.org/10.24887/0028-2448-2019-4-58-61
7. Zhang X. et al., Experimental study and mechanism investigation of cyclic waterflooding, Journal of Petrochemical Universities, 2016, no. 6,
pp. 66–70, DOI: http://doi.org/10.3969/j.issn.1006-396X.2015.06.013
8. Saleh N. et al., Cyclic water flood for enhanced injection efficiency & reduced water re-circulation in Sabiriyah Mauddud, North Kuwait, SPE-198137-MS, 2019, http://doi.org/10.2118/198137-MS
9. Krivoshchekov S.N., Kochnev A.A., Ravelev K.A., Development of an algorithm for determining the technological parameters of acid composition injection during treatment of the near-bottomhole zone, taking into account economic efficiency (In Russ.), Zapiski Gornogo instituta = Journal of Mining Institute, 2021, V. 250, no. 4, pp. 587–595,
DOI: http://doi.org/10.31897/PMI.2021.4.12
10. Novikov V.A., Method for forecasting the efficiency of matrix acid treatment of carbonate (In Russ.), Vestnik Permskogo natsional’nogo issledovatel’skogo politekhnicheskogo universiteta. Geologiya, neftegazovoe i gornoe delo = Perm Journal of Petroleum and Mining Engineering, 2021, V. 21, no. 3, pp. 137–143,
DOI: http://doi.org/10.15593/2712-8008/2021.3.6
11. Dulkarnaev M.R., Vil’danov A.A., Baushin V.V., Gulyaev V.N., Justification of non-stationary water flooding application and improvement of the reservoir pressure maintenance system at the Druzhnoye field (In Russ.), Neftyanoe khozyaystvo = Oil Industry, 2013, no. 4, pp. 104–106.
12. A Ivanov A.N., Pyatibratov P.V., Aubakirov A.R., Dzyublo A.D., Justification of injection wells operating modes for cyclic waterflooding application (In Russ.), Neftyanoe khozyaystvo = Oil Industry, 2020, no. 2, pp. 28–31, DOI: http://doi.org/10.24887/0028-2448-2020-2-28-31