Developing CAPEX database for oil field surface facilities construction at Bashneft PJSOC
Authors: A.R. Atnagulov, R.D. Rakhmangulov, P.V. Vinogradov (BashNIPIneft LLC, RF, Ufa), G.A. Kireev, D.Yu. Gizbrekht (Bashneft PJSOC, RF, Ufa)
Key words: CAPEX, cost evaluation of oil field surface facilities construction, cost estimate conversion factors
The paper covers problems of creating a corporate CAPEX database with in-built tools for cost analysis of field surface facilities for the technical and economical evaluation of various projects and business planning at Bashneft PJSOC.
References
1. URL: http://zakupki.rosneft.ru
2. Chizhikov S.V., Dubovitskaya E.A., Tkachenko M.A., Yunusov I.E., Conceptual design of oil & gas cost estimation software product line for the different project stages (In Russ.), Neftyanoe khozyaystvo = Oil Industry, 2014, no. 9, pp. 20 – 23.
Attention! To buy the complete text of article (Russian version a format - PDF) or to read the material which is in open access
only the authorized visitors of the website can. .