Cost engineering in Gazprom Neft PJSC: current situation and future development

Authors: M.N. Khasanov (Gazpromneft NTC LLC, RF, Saint-Petersburg), Yu.V. Maksimov, O.O. Skudar, S.V. Tretiakov, L.A. Pashkevich (Gazpromneft NTC LLC, RF, Saint-Petersburg), D.A. Sugaipov (Gazpromneft-Razvitie LLC, RF, Saint-Petersburg)

Key words: cost estimation, cost engineering, cost model

This article is about the cost engineering development at the Gazprom Neft PJSC. We demonstrate the key results and basic findings in the fields of the tools’ development of capital cost estimation in early stages of project realization. The prospects for further development are presented below in terms of the total cost of ownership by taking into account operational costs for the entire period of project life.
References
1. Saibi M., A probabilistic approach for drilling cost engineering and management, SPE-107211-MS.
2. Khasanov M.M., Sugaipov D.A., Ushmaev O.S. et al., Development of cost
engineering in Gazprom Neft JSC (In Russ.), Neftyanoe khozyaystvo = Oil Industry, 2013, no.12, pp. 14-16.
3. Khasanov M.M., Sugaipov D.A., Zhagrin A.V. et al., Improvement of CAPEX estimation accuracy during early project stages (In Russ.), Neftyanoe
khozyaystvo = Oil Industry, 2014, no. 12, pp. 22-27.
4. Wardt J., Peterson S., Well cost estimation and control - Advanced methodologies
for effective well cost management, SPE-173148-MS.
5. Ismagilov R.R., Maksimov Yu.V., Ushmaev O.S., Mozhchil' A.F., Gil'mutdinovaN. Z., Integrated model for complex management of reservoir engineering and field construction (In Russ.), Neftyanoe khozyaystvo = Oil Indus try, 2014, no. 12, pp. 71–73.


Attention!
To buy the complete text of article (Russian version a format - PDF) or to read the material which is in open access only the authorized visitors of the website can. .