Design was prepared and drilling technology of multilateral wells was tested on the Shagirtsko-Gozhanskoe oilfield, oilfield behalf of Arhangelskogo and Nozhovskogo oilfield in Perm region. In the process of well construction new technologies were developed and introduced.
Key words: multilateral drilling, design of multilateral wells, well design.
Design was prepared and drilling technology of multilateral wells was tested on the Shagirtsko-Gozhanskoe oilfield, oilfield behalf of Arhangelskogo and Nozhovskogo oilfield in Perm region. In the process of well construction new technologies were developed and introduced.
Key words: multilateral drilling, design of multilateral wells, well design.