The experience of design and construction of a multihole wells

Authors: Lyadova N.A., Il'yasov S.E., Okromelidze G.V., Suntsov S.V., Kuchevasov S.I. (Affiliate Branch of OOO “LUKOIL-Engineering” PermNIPIneft” in Perm)

Design was prepared and drilling technology of multilateral wells was tested on the Shagirtsko-Gozhanskoe oilfield, oilfield behalf of Arhangelskogo and Nozhovskogo oilfield in Perm region. In the process of well construction new technologies were developed and introduced.

Key words: multilateral drilling, design of multilateral wells, well design.

 

Design was prepared and drilling technology of multilateral wells was tested on the Shagirtsko-Gozhanskoe oilfield, oilfield behalf of Arhangelskogo and Nozhovskogo oilfield in Perm region. In the process of well construction new technologies were developed and introduced.

Key words: multilateral drilling, design of multilateral wells, well design.

 



Attention!
To buy the complete text of article (a format - PDF) or to read the material which is in open access only the authorized visitors of the website can. .

Mobile applications

Read our magazine on mobile devices

Загрузить в Google play

Press Releases

01.07.2022
29.06.2022
23.06.2022