Problems of dual completion technology implementation at multilayer fields of Russia

Authors: V.A. Afanasjev, V.A. Zakharov, I.V. Zakharov (Tyumen Branch of SurgutNIPIneft), S.N. Matveev, Yu.K. Tsiku (Komsomolskneft Oil and Gas Production Department)

The reasons, restraining the use of the technology and technique of dual completion of multilayer fields at Russia oilfields, are identified. The equipment, which is currently in commercial production and can be used in wells, is given. The lines, on which it is necessary to speed up research and development work on the creation of well equipment for simultaneously-separate oil recovery with the help of electrical centrifugal pump units, are indicated.

The reasons, restraining the use of the technology and technique of dual completion of multilayer fields at Russia oilfields, are identified. The equipment, which is currently in commercial production and can be used in wells, is given. The lines, on which it is necessary to speed up research and development work on the creation of well equipment for simultaneously-separate oil recovery with the help of electrical centrifugal pump units, are indicated.



Attention!
To buy the complete text of article (a format - PDF) or to read the material which is in open access only the authorized visitors of the website can. .

Mobile applications

Read our magazine on mobile devices

Загрузить в Google play

Press Releases

08.12.2021
24.11.2021
23.11.2021
Конкурс на соискание молодежной премии имени академика И.М. Губкина