Reservoir monitoring and field development in Gasprom neft JSC

Authors: A.I. Ipatov, M.I. Kremenetskiy, D.N. Gulyaev (Gazpromneft NTC LLC), M.F. Nuriev (Gazprom neft JSC)
Gazprom Neft experience in permanent downhole measurement tool (PDMT) implementation to improve production control and field optimization is presented. Real time downhole pressure measurements are made in all producers and injectors. Smart wells in case of commingled production are used in all injectors and pilot project is started for producers, in other cases permanent downhole rate, water hold up, pressure and temperature gages are used with real-time on-line downhole to surface transmission. On base of reliable data field development was optimized, water cut – reduced and oil production increased.


Attention!
To buy the complete text of article (Russian version a format - PDF) or to read the material which is in open access only the authorized visitors of the website can. .