The first experience on design in Russia of an installation for drilling waste pumping in a layer

Authors: G.P. Lyubin (Gazpromneft-Noyabrskneftegaz OAO), S.М. Sokolov, A.G. Perekupka, A.R. Nagayev, G.S. Sinitsyn (Giprotyumenneftegaz OAO)
Design decisions and technical and economic parameters of the project of installation for processing and pumping of drilling waste in a layer are given.
Design decisions and technical and economic parameters of the project of installation for processing and pumping of drilling waste in a layer are given.


Attention!
To buy the complete text of article (a format - PDF) or to read the material which is in open access only the authorized visitors of the website can. .

Mobile applications

Read our magazine on mobile devices

Загрузить в Google play

Press Releases

08.12.2021
24.11.2021
23.11.2021
Конкурс на соискание молодежной премии имени академика И.М. Губкина